Packages for Your Panel Manufacturing and

Panel FAT QC Packs!

Our QC Pack Accelerator System simplifies compliance, saves you hours,

and ensures inspection-ready results.

* Custom Packages for Every Panel Type

* Fast Turnaround. Zero Guesswork

* Consulting and Calculation in One Step

QC Pack Calculators

Estimate Your Panel Manufacturing and Panel FAT QC Pack Requirements

Use this simple calculator to get a quick estimate of how many QC Packs your panel manufacturing and

panel FAT project needs. This helps us customize your quote and delivery timeline.

Panel Manufacturing and Panel FAT Packages
Pricing Tier Multiplier: 1.00x
QC Pack Totals
Package Proposal
Panel Quantities
Description Qty
Process Control (PCS) Panels
Remote IO (RIO) Panels
Power (IPDB) Panels
Network (NDB) Panels
Instrument (INB) Panels
Marshalling Junction Boxes (MJB)
Marshalling Communication Boxes (MCB)
Field Communication Boxes (FCB)
Radio Communication Boxes (RCB)

Panel Manufacturing and FAT Packages

Packages to suit all project sizes.

Extra Small

Up to 100 packs

QC Packs delivery period

Turnaround

  • 2 Days

small

Up to 200 packs

QC Packs delivery period

Turnaround

  • 3 Days

Medium

Up to 300 packs

QC Packs delivery period

Turnaround

  • 4 Days

large

Up to 400 packs

QC Packs delivery period

Turnaround

  • 5 Days

extra large

Up to 500 packs

QC Packs delivery period

Turnaround

  • 6 Days

What’s Included in Your QC Pack?

QC Packs for all your Panel Manufacturing and Panel FAT needs...

What’s Included in Your QC Pack?
QC Packs for all your Panel Manufacturing and Panel FAT needs...
  • 1. Process Control (PCS) Panels
  • 2. Remote IO (RIO) Panels
  • 3. Power (IPDB) Panels
  • 4. Network (NDB) Panels
  • 5. Instrument (INB) Panels
  • 6. Marshalling Junction Boxes (MJB) Panels
  • 7. Marshalling Communication Boxes (MCB) Panels (i.e. Asi...)
  • 8. Field Communication Boxes (FCB) Panels (i.e. Asi...)
  • 9. Radio Communication Boxes (RCB) Panels

Comparison

Traditional QC Pack creation process

No Activities Personnel Units Estimated Durations Estimated Qty Produced
Admin Eng / Supervisor
1 Prepare Generic QC Packs 1 0 8Hr/days 1
Panel Manufacturing and FAT
2 Familiarization of Project Panel Manufacturing Requirements 0 1 8Hr/days 4
3 Compiling Lists of Equipment requiring QC Packs 1 1 8Hr/days 1
4 Compile Project Specific QC Packs 1 0 8Hr/days 1 22
5 Review Project Specific QC Packs 0 1 8Hr/days 1 22
Comparisons
6 Up to 100 QC Packs 3 3 8Hr/days 17 100
7 Up to 200 QC Packs 3 3 8Hr/days 22 200
8 Up to 300 QC Packs 3 3 8Hr/days 26 300
9 Up to 400 QC Packs 3 3 8Hr/days 31 400
10 Up to 500 QC Packs 3 3 8Hr/days 36 500

FAQ's (Panel Manufacturing and FAT)

How do I calculate the number of QC Packs I need?

Use our Panel Manufacturing and FAT QC Pack Calculator.
Just count the number of equipment items in your design and enter them into the calculator.
It totals everything for you and shows the number of QC Packs needed instantly.

Which package should I choose?

Use the Panel Manufacturing and FAT QC Pack Calculator.

Your totals will guide you to the right package size, based on actual design volume.

Why are there different package sizes?

It’s about scale.

The more packs you order, the lower your cost per pack—saving you time and budget.

Do all the Panel Manufacturing and Panel FAT QC Packs contain all the documents?

Every pack includes a complete document set, tailored by type:

1. Panel Manufacturing and FAT

1.1. Each type of Panel Manufacturing and FAT QC Pack is dedicated to either;

1.1.1. Process Control (PCS) Panels

1.1.2. Remote IO (RIO) Panels

1.1.3. Power (IPDB) Panels

1.1.4. Network (NDB) Panels

1.1.5. Instrument (INB) Panels

1.1.6. Marshalling Junction Boxes (MJB) Panels

1.1.7. Marshalling Communication Boxes (MCB) Panels (i.e., Asi...)

1.1.8. Field Communication Boxes (FCB) Panels (i.e., Asi...)

1.1.9. Radio Communication Boxes (RCB) Panels

Look for the "■" icon in our Deliverables section—that's what’s inside each pack.

How long does Panel Manufacturing and FAT QC Packs take to deliver?

Delivery time depends on your package size.
Most projects are completed within 6 working days after the preparation work has been done.

Why choose us instead of doing this in-house?

Traditional QC Pack creation slows you down. We flip the script.

We save you time.

We improve the consistency and reliability.

We’ve engineered the system so your team doesn’t have to.

See the comparison section for more detail.

What’s the order process?

1. Book a FREE Consultation—we’ll guide you from Step 2 to 7.

2. Log in / Create your account

3. Set up your Project Profile

4. Complete your Panel Manufacturing and FAT Calculator

5. Review auto-generated proposal

6. Accept + Pay securely online

7. We start building your QC Packs

Bring Your Project And We Will Create Your QC Packs