Our Premium Value QC Pack Accelerator System has packaged options to suite all your Instrumentation needs.
QC Pack Types | Document Category | Description | Number |
---|---|---|---|
Control Rooms (CCR) | Control Room | No of CCRs | |
Process Control (PCS) Panels | IO Panels | No of PCS panels | |
Remote IO (RIO) Panels | IO Panels | No of RIO panels | |
Power (IPDB) Panels | IPDB Panels | No of DB panels | |
Network (NDB) Panels | Standard Panels | No of NDB panels | |
PLC Panels (Vendor Packs) | Standard Panels | No of Vendor PLC panels | |
Instrument (INB) Panels | Standard Panels | No of INB panels | |
Equipment Junction Boxes (EJB) Panels | Standard Panels | No of EJB panels | |
Marshalling Junction Boxes (MJB) Panels | Standard Panels | No of MJB panels | |
Marshalling Communication Boxes (MCB) Panels | Standard Panels | No of MCB panels | |
Field Communication Boxes (FCB) Panels | Standard Panels | No of FCB panels | |
Radio Communication Boxes (RCB) Panels | Standard Panels | No of RCB panels | |
Remote IO (RIO) Network | Network | No of RIO and other panels to be networked | |
MCC Network | Network | No of MCCs to be networked | |
Instrumentation | Instrumentation | No of Instruments | |
Control Valves | Control Valves | No of Control Valves | |
Total QC Packs required | 1772 |
Document Build Up | Included |
---|---|
Cover Page | ■ |
Index | ■ |
Responsibility Appointments | ■ |
Quality Control Plan | ■ |
Comments And Remarks | ■ |
C2 - Acceptance And Handover Certificate | ■ |
C2 - Request For Inspections | ■ |
C1 - Acceptance And Handover Certificate | ■ |
C1 - Request For Inspections | ■ |
Activities for Installation | ■ |
Reference Document List | ■ |
C2 - Commissioning Checks | ■ |
C1 - Installation Checks | ■ |
Check Lists | ■ |
Punch Lists | ■ |
As Built - Documents And Drawings | ■ |
Count the number of individual pieces of equipment based on your design. Enter the numbers into their respective fields in the Instrumentation QC Pack Calculator. The total number will be totalized. This would represent the total number of QC Packs to be generated, based on your design.
The packages allow for Racking, Electrical and Instrumentation QC Packs. Making use of the 3 QC Pack calculators would greatly assist you in determining a package size that is best suited for your project, based on your design.
This allows for economy of scale. The greater the number of Instrumentation QC Packs to be produced, the lower the per-unit cost.
Each type of Instrumentation QC Pack is dedicated to either;
1. Control Room
2. Standard Panels
3. IO Panels
4. IPDB Panels
5. Network
6. Instrumentation
7. Control Valves.
When you see "■" in the package deliverables list, you know what makes up the full QC Pack.
The duration depends on the package size your project requires. The durations vary between 4 and 10 working days after the preparation work has been done.
We would save you time and improve the consistency and reliability of your QC Packs.
Traditionally you would create your QC Packs in parallel with construction. This normally leads to working late nights, causing late sign-offs and handovers.
See the comparison section for more detail.
1. Book your FREE Consultation Session during which we would follow steps 3 to 8.
- OR -
2. You can follow steps 3 to 8 yourself.
3. Create a client account by clicking the "Login" link.
4. You will then be taken to a client area.
5. In the client area, you need to create a Project Profile.
6. You will then need to complete an Instrumentation QC Pack calculation form to determine the package size.
7. That will generate a proposal.
8. On acceptance, the order form will open for payment.