Let's Determine Your Next Project's Cable Racking QC Pack Requirements!

We'll guide you!

We’ve bundled the perfect QC Pack options to match your project’s racking

demands—no complexity, just clarity.

Racking QC Pack Calculator

Estimate Your Racking QC Pack Requirements

Use this simple calculator to get a quick estimate of how many QC Packs your racking

project needs. This helps us customize your quote and delivery timeline.

QC Pack Table
QC Pack Types Description Number
Cable Rack Areas No of racking areas
Cable Duct Areas No of ducting areas
Cable Trench Areas No of trenching areas
Cable Sleeve Areas No of sleeve areas
Total QC Packs required 44

Here’s What You Get with Every Racking QC Pack

QC Packs are available for Cable Racks, Cable Ducts, Cable Trenches &

Cable Sleeves.

We’ve compiled every essential document to ensure quality, compliance,

and peace of mind—from installation to client handover.

Document Build Up Included
Cover Page
Index
Responsibility Appointments
Quality Control Plan
Comments And Remarks
C1 - Acceptance And Handover Certificate
C1 - Request For Inspections
Activities for Installation
Reference Document List
C1 - Installation Checks
Check Lists
Punch Lists
As Built - Documents And Drawings

FAQs (Racking)

How do I calculate the number of QC Packs I need?

Count how many layout drawings show racking, ducting, trenching, or sleeving.
Enter these into the calculator. The sum = number of QC Packs required.

Which package should I choose?

Use all 3 QC Pack Calculators (Racking, Electrical, Instrumentation).

Your totals will guide you to the right package size, based on actual design volume.

Why are there different package sizes?

It’s about scale.

The more packs you order, the lower your cost per pack—saving you time and budget.

Do all the Racking QC Packs contain all the documents?

Every pack includes a complete document set, tailored by type:

1. Racking

2. Ducts

3. Trenches

4. Sleeves.

Look for the “■” icon in our Deliverables section—that's what’s inside each pack.

How long do Racking QC Packs take to deliver?

Delivery time depends on your package size.
Most projects are completed within 4–10 working days once setup is finalized.

Why choose us instead of doing this in-house?

Traditional QC Pack creation slows you down. We flip the script.

We save you time.

We improve the consistency and reliability.

We’ve engineered the system so your team doesn’t have to.

See the comparison section for more detail.

What's the order process?

1. Book a FREE Consultation—we’ll guide you from Step 2 to 7.

2. Log in / Create your account

3. Set up your Project Profile

4. Complete your Racking Calculator

5. Review auto-generated proposal

6. Accept + Pay securely online

7. We start building your QC Packs

Let us build your next project's QC Packs—faster, smarter, and stress-free.

Copyright 2025. QCPacks.com. All Rights Reserved.