Our Premium Value QC Pack Accelerator System has packaged options to suite all your Electrical needs.
QC Pack Types | Description | Number |
---|---|---|
MV Switch Gear | No of MV Switch Gear (Subs) | |
MCCs | No of MCCs | |
Transformers | No of Transformers | |
MCC Network | No of MCC Network | |
Generators | No of Generators | |
RMU,s | No of RMU,s | |
BTU,s | No of BTU,s | |
PFC,s | No of PFC,s | |
DB Panels | No of DB Panels | |
Other Panels | No of Other Panels | |
UPS,s | No of UPS,s | |
Mini-Subs | No of Mini-Subs | |
Earthing & Lighting | No of Earthing & Lighting areas | |
Outlets | No of Outlet areas | |
Lighting | No of Lighting areas | |
Drives | No of Drives | |
Total QC Packs required | 612 |
Document Build Up | Included |
---|---|
Cover Page | ■ |
Index | ■ |
Responsibility Appointments | ■ |
Quality Control Plan | ■ |
Comments And Remarks | ■ |
C2 - Acceptance And Handover Certificate | ■ |
C2 - Request For Inspections | ■ |
C1 - Acceptance And Handover Certificate | ■ |
C1 - Request For Inspections | ■ |
Activities for Installation | ■ |
Reference Document List | ■ |
C2 - Commissioning Checks | ■ |
C1 - Installation Checks | ■ |
Check Lists | ■ |
Punch Lists | ■ |
As Built - Documents And Drawings | ■ |
Count the number of individual pieces of equipment based on your design as well as the location layout drawings to determine the number of areas associated with Earthing & Lightning, Outlets & Lighting. Enter the numbers into their respective fields in the Electrical QC Pack Calculator. The total number will be totalized. This would represent the total number of QC Packs to be generated, based on your design.
The packages allow for Racking, Electrical and Instrumentation QC Packs. Making use of the 3 QC Pack calculators would greatly assist you in determining a package size that is best suited for your project, based on your design.
This allows for economy of scale. The greater the number of Electrical QC Packs to be produced, the lower the per-unit cost.
Each type of Electrical QC Pack is dedicated to either;
1. MV Switch Gear
2. MCC's
3. Transformers
4. MCC Network
5. Generators
6. RMU's
7. BTU's
8. PFC's
9. DB Panels
10. Other Panels
11. UPS's
12. Mini-Subs
13. Earthing & Lightning
14. Outlets
15. Lighting
16. Drives
When you see "■" in the package deliverables list, you know what makes up the full QC Pack.
The duration depends on the package size your project requires. The durations vary between 4 and 10 working days after the preparation work has been done.
We would save you time and improve the consistency and reliability of your QC Packs.
Traditionally you would create your QC Packs in parallel with construction. This normally leads to working late nights, causing late sign-offs and handovers.
See the comparison section for more detail.
1. Book your FREE Consultation Session during which we would follow steps 3 to 8.
- OR -
2. You can follow steps 3 to 8 yourself.
3. Create a client account by clicking the "Login" link.
4. You will then be taken to a client area.
5. In the client area, you need to create a Project Profile.
6. You will then need to complete an Electrical QC Pack calculation form to determine the package size.
7. That will generate a proposal.
8. On acceptance, the order form will open for payment.
Copyright 2025. QCPacks.com. All Rights Reserved.