Let's Determine Your Next Project's Electrical QC Pack Requirements!

We'll Guide You!

Whether you're working on a substation or a full facility installation,

our QC Pack Accelerator System will help you plan, prepare, and

deliver with confidence.

Electrical QC Pack Calculator

Estimate Your Racking QC Pack Requirements

Use this simple calculator to get a quick estimate of how many QC Packs your electrical project needs. This helps us customize your quote and delivery timeline.

QC Pack Table
QC Pack Types Description Number
MV Switch GearNo of MV Switch Gear (Subs)
MCCsNo of MCC's
TransformersNo of Transformers
MCC NetworkNo of MCC Network
GeneratorsNo of Generators
RMU'sNo of RMU's
BTU'sNo of BTU's
PFC'sNo of PFC's
DB PanelsNo of DB Panels
Other PanelsNo of Other Panels
UPS'sNo of UPS's
Mini-SubsNo of Mini-Subs
Earthing & LightingNo of Earthing & Lighting areas
OutletsNo of Outlet areas
LightingNo of Lighting areas
DrivesNo of Drives
Total QC Packs required612

What’s Included in Your Electrical QC Pack

QC Packs are available for MV Switch Gear, MCC's, Trans-formers, MCC Networks,

Generators, RMU's, BTU's, PFC's, DB Panels, Other Panels, UPS's, Mini-Subs, Earthing & Lightning, Outlets, Lighting & Drives.

Every QC Pack is built to ensure compliance, accountability, and

quality — from planning to handover.

Document Build Up Included
Cover Page
Index
Responsibility Appointments
Quality Control Plan
Comments And Remarks
C2 - Acceptance And Handover Certificate
C2 - Request For Inspections
C1 - Acceptance And Handover Certificate
C1 - Request For Inspections
Activities for Installation
Reference Document List
C2 - Commissioning Checks
C1 - Installation Checks
Check Lists
Punch Lists
As Built - Documents And Drawings

FAQs (Electrical)

How do I calculate the number of QC Packs I need?

Start with your design drawings and equipment schedules. Count the number of components like MV switchgear, MCCs, DB panels, and areas for earthing, outlets, and lighting.

Enter these into the calculator. The sum = number of QC Packs required.

Which package should I choose?

Use all 3 QC Pack Calculators (Racking, Electrical, Instrumentation).

Your totals will guide you to the right package size, based on actual design volume.

Why are there different package sizes?

It’s about scale.

The more packs you order, the lower your cost per pack—saving you time and budget.

Do all the Electrical QC Packs contain all the documents?

Every pack includes a complete document set, tailored by type:

1. MV Switch Gear

2. MCC's

3. Transformers

4. MCC Network

5. Generators

6. RMU's

7. BTU's

8. PFC's

9. DB Panels

10. Other Panels

11. UPS's

12. Mini-Subs

13. Earthing & Lightning

14. Outlets

15. Lighting

16. Drives

Look for the "■" icon in our Deliverables section—that's what’s inside each pack.

How long does Electrical QC Packs take to deliver?

Delivery time depends on your package size.
Most projects are completed within 4–10 working days once setup is finalized.

Why choose us instead of doing this in-house?

Traditional QC Pack creation slows you down. We flip the script.

We save you time.

We improve the consistency and reliability.

We’ve engineered the system so your team doesn’t have to.

See the comparison section for more detail.

What’s the order process?

1. Book a FREE Consultation—we’ll guide you from Step 2 to 7.

2. Log in / Create your account

3. Set up your Project Profile

4. Complete your Electrical Calculator

5. Review auto-generated proposal

6. Accept + Pay securely online

7. We start building your QC Packs

Let us build your next project's QC Packs—faster, smarter, and stress-free.