
Use this simple calculator to get a quick estimate of how many QC Packs your electrical project needs. This helps us customize your quote and delivery timeline.
| QC Pack Types | Description | Number |
|---|---|---|
| MV Switch Gear | No of MV Switch Gear (Subs) | |
| MCCs | No of MCC's | |
| Transformers | No of Transformers | |
| MCC Network | No of MCC Network | |
| Generators | No of Generators | |
| RMU's | No of RMU's | |
| BTU's | No of BTU's | |
| PFC's | No of PFC's | |
| DB Panels | No of DB Panels | |
| Other Panels | No of Other Panels | |
| UPS's | No of UPS's | |
| Mini-Subs | No of Mini-Subs | |
| Earthing & Lighting | No of Earthing & Lighting areas | |
| Outlets | No of Outlet areas | |
| Lighting | No of Lighting areas | |
| Drives | No of Drives | |
| Total QC Packs required | 612 |
| Document Build Up | Included |
|---|---|
| Cover Page | ■ |
| Index | ■ |
| Responsibility Appointments | ■ |
| Quality Control Plan | ■ |
| Comments And Remarks | ■ |
| C2 - Acceptance And Handover Certificate | ■ |
| C2 - Request For Inspections | ■ |
| C1 - Acceptance And Handover Certificate | ■ |
| C1 - Request For Inspections | ■ |
| Activities for Installation | ■ |
| Reference Document List | ■ |
| C2 - Commissioning Checks | ■ |
| C1 - Installation Checks | ■ |
| Check Lists | ■ |
| Punch Lists | ■ |
| As Built - Documents And Drawings | ■ |
Start with your design drawings and equipment schedules. Count the number of components like MV switchgear, MCCs, DB panels, and areas for earthing, outlets, and lighting.
Enter these into the calculator. The sum = number of QC Packs required.
Use all 3 QC Pack Calculators (Racking, Electrical, Instrumentation).
Your totals will guide you to the right package size, based on actual design volume.
It’s about scale.
The more packs you order, the lower your cost per pack—saving you time and budget.
Every pack includes a complete document set, tailored by type:
1. MV Switch Gear
2. MCC's
3. Transformers
4. MCC Network
5. Generators
6. RMU's
7. BTU's
8. PFC's
9. DB Panels
10. Other Panels
11. UPS's
12. Mini-Subs
13. Earthing & Lightning
14. Outlets
15. Lighting
16. Drives
Look for the "■" icon in our Deliverables section—that's what’s inside each pack.
Delivery time depends on your package size.
Most projects are completed within 4–10 working days once setup is finalized.
Traditional QC Pack creation slows you down. We flip the script.
We save you time.
We improve the consistency and reliability.
We’ve engineered the system so your team doesn’t have to.
See the comparison section for more detail.
1. Book a FREE Consultation—we’ll guide you from Step 2 to 7.
2. Log in / Create your account
3. Set up your Project Profile
4. Complete your Electrical Calculator
5. Review auto-generated proposal
6. Accept + Pay securely online
7. We start building your QC Packs

Copyright 2025. QCPacks.com. All Rights Reserved.