Packages for Your Installation and

Commissioning QC Packs!

Tailored Packages | Fast Turnarounds | Scalable for Any Project Size

No more scrambling—get the exact QC documentation

your project needs, when you need it.

Installation and Commissioning Packages

QC Pack Calculators
Estimate Your Installation and Commissioning QC Pack Requirements
Use this simple calculator to get a quick estimate of how many QC Packs your installation and commissioning project needs. This helps us customize your quote and delivery timeline.
Pricing Tier Multiplier: 1.00x
QC Pack Totals
Package Proposal
Racking Totals
Electrical Totals
Instrumentation Totals
Racking
DescriptionQTY
Cable Rack Areas
Cable Duct Areas
Cable Trench Areas
Cable Sleeve Areas
Electrical
DescriptionQTY
MV Switch Gear
MCC's
Transformers
MCC Network
Generators
RMU's
BTU's
PFC's
DB Panels
Other Panels
UPS's
Mini-Subs
Earthing & Lighting
Outlets
Lighting
Drives
Instrumentation
DescriptionQTY
Control Rooms (CCR)
Process Control (PCS) Panels
Remote IO (RIO) Panels
Power (IPDB) Panels
Network (NDB) Panels
PLC Panels (Vendor Packs)
Instrument (INB) Panels
Equipment Junction Boxes (EJB) Panels (Vendor Panels)
Marshalling Junction Boxes (MJB) Panels
Marshalling communication Boxes (MCB) Panels (i.e. Asi...)
Field Communication Boxes (FCB) Panels (i.e. Asi...)
Radio Communication Boxes (RCB) Panels
Remote IO (RIO) Network
MCC Network
Instrumentation
Local Instrumentation
Control Valves
Installation and Commissioning Packages
Packages to suite all project sizes!
Extra Small
Up to 1000 packs
QC Packs delivery period
Turnaround: 3 Days
Small
Up to 2000 packs
QC Packs delivery period
Turnaround: 4 Days
Medium
Up to 3000 packs
QC Packs delivery period
Turnaround: 6 Days
Large
Up to 4000 packs
QC Packs delivery period
Turnaround: 8 Days
Extra Large
Up to 5000 packs
QC Packs delivery period
Turnaround: 10 Days
What's Included in Your QC Pack?
QC Packs for all your Installation and Commissioning needs...
Racking
  • 1. Cable Racks
  • 2. Cable Ducts
  • 3. Cable Trenches
  • 4. Cable Sleeves
  • 5. Generators
  • 6. RMU's
  • 7. BTU's
  • 8. PFC's
  • 9. DB Panels
  • 10. Other Panels
  • 11. UPS's
  • 12. Mini-Subs
  • 13. Earthing & Lighting
  • 14. Outlets
  • 15. Lighting
  • 16. Drives
Electrical
  • 1. MV Switch Gear
  • 2. MCC's
  • 3. Transformers
  • 4. MCC Networks
  • 5. Network (NDB) Panels
Instrumentation
  • 1. Control Rooms (CCR)
  • 2. Process Control (PCS) Panels
  • 3. Remote IO (RIO) Panels
  • 4. Power (IPDB) Panels
  • 5. Instrumentation
  • 6. Local Instrumentation

Installation and Commissioning Packages

Packages to suit all project sizes.

Extra Small

Up to 2000 packs

QC Packs delivery period

Turnaround

  • 4 Days

small

Up to 3000 packs

QC Packs delivery period

Turnaround

  • 6 Days

Medium

Up to 4000 packs

QC Packs delivery period

Turnaround

  • 8 Days

large

Up to 5000 packs

QC Packs delivery period

Turnaround

  • 10 Days

Comparison
Traditional QC Pack creation process
No Activities Personnel Units Estimated Durations Estimated Qty Produced
Admin Eng / Supervisor
1 Prepare Generic QC Packs 1 0 8Hr/days 2
Racking
2 Familiarization of Project Racking Requirements 0 1 8Hr/days 20
3 Compiling Lists of Equipment requiring QC Packs 1 1 8Hr/days 1
4 Compile Project Specific QC Packs 1 0 8Hr/days 22
5 Review Project Specific QC Packs 0 1 8Hr/days 22
Electrical
6 Familiarization of Project Electrical Requirements 0 1 8Hr/days 20
7 Compiling Lists of Equipment requiring QC Packs 1 1 8Hr/days 1
8 Compile Project Specific QC Packs 1 0 8Hr/days 22
9 Review Project Specific QC Packs 0 1 8Hr/days 22
Instrumentation
10 Familiarization of Project Instrumentation Requirements 0 1 8Hr/days 20
11 Compiling Lists of Equipment requiring QC Packs 1 1 8Hr/days 1
12 Compile Project Specific QC Packs 1 0 8Hr/days 22
13 Review Project Specific QC Packs 0 1 8Hr/days 22
Comparisons
14 Up to 1000 QC Packs 3 3 8Hr/days 116 1000
15 Up to 2000 QC Packs 3 3 8Hr/days 161 2000
16 Up to 3000 QC Packs 3 3 8Hr/days 207 3000
17 Up to 4000 QC Packs 3 3 8Hr/days 252 4000
18 Up to 5000 QC Packs 3 3 8Hr/days 297 5000

FAQ's (Installation and Commissioning)

How do I calculate the number of QC Packs I need?

Use our Installation & Commissioning QC Pack Calculator.
Just count the number of equipment items in your design and enter them into the calculator.
It totals everything for you and shows the number of QC Packs needed instantly.

Which package should I choose?

Use the Installation and Commissioning QC Pack Calculator.

Your totals will guide you to the right package size, based on actual design volume.

Why are there different package sizes?

It’s about scale.

The more packs you order, the lower your cost per pack—saving you time and budget.

Do all the Installation and Commissioning QC Packs contain all the documents?

Every pack includes a complete document set, tailored by type:

1. Racking

1.1. Each type of Racking QC Pack is dedicated to either;

1.1.1. Racking

1.1.2. Ducts

1.1.3. Trenches

1.1.4. Sleeves.

2. Electrical

2.1. Each type of Electrical QC Pack is dedicated to either;

2.1.1. MV Switch Gear

2.1.2. MCC's

2.1.3. Transformers

2.1.4. MCC Network

2.1.5. Generators

2.1.6. RMU's

2.1.7. BTU's

2.1.8. PFC's

2.1.9. DB Panels

2.1.10. Other Panels

2.1.11. UPS's

2.1.12. Mini-Subs

2.1.13. Earthing & Lightning

2.1.14. Outlets

2.1.15. Lighting

2.1.16. Drives

3. Instrumentation

3.1. Each type of Instrumentation QC Pack is dedicated to either;

3.1.1. Control Room

3.1.2. Standard Panels

3.1.3. IO Panels

3.1.4. IPDB Panels

3.1.5. Network

3.1.6. Instrumentation

3.1.7. Local Instrumentation (Non-IO, e.g. Pressure Gauges, Temperature Gauges, etc.)

3.1.8. Control Valves

Look for the "■" icon in our Deliverables section—that's what’s inside each pack.

How long does Installation and Commissioning QC Packs take to deliver?

Delivery time depends on your package size.
Most projects are completed within 3–10 working days after the preparation work has been done.

Why choose us instead of doing this in-house?

Traditional QC Pack creation slows you down. We flip the script.

We save you time.

We improve the consistency and reliability.

We’ve engineered the system so your team doesn’t have to.

See the comparison section for more detail.

What’s the order process?

1. Book a FREE Consultation—we’ll guide you from Step 2 to 7.

2. Log in / Create your account

3. Set up your Project Profile

4. Complete your Installation and Commissioning Calculator

5. Review auto-generated proposal

6. Accept + Pay securely online

7. We start building your QC Packs

Bring Your Project And We Will Create Your QC Packs

Copyright 2026. QCPacks.com. All Rights Reserved.