The QC Pack Accelerator System delivers prepackaged, high-value solutions tailored to your software & FAT workflow—designed for speed, accuracy,

and compliance.

QC Pack Calculators

Estimate Your Software Development and FAT QC Pack Requirements

Use this simple calculator to get a quick estimate of how many QC Packs your software development and FAT project needs. This helps us customize your quote and delivery timeline.

Software Development and FAT
Pricing Tier Multiplier: 1.00x
QC Pack Totals
Package Proposal
Software Configuration Quantities
Description Qty
PLC - Plant Software Area(s)
SCADA - Plant Software Area(s)
Server(s) - Configuration
Engineering Workstation(s) - Configuration
Operator Workstation(s) - Configuration
Historian - Configuration
Remote Access Server(s) - Configuration
Firewall(s) - Configuration
Switch(es) - Configuration

Software Development and FAT Packages

Packages to suit all project sizes.

Extra Small

Up to 100 packs

QC Packs delivery period

  • 2 Days

small

Up to 200 packs

QC Packs delivery period

  • 3 Days

Medium

Up to 300 packs

QC Packs delivery period

  • 4 Days

large

Up to 400 packs

QC Packs delivery period

  • 5 Days

extra large

Up to 400 packs

QC Packs delivery period

  • 5 Days

What’s Included in Your QC Pack?

QC Packs for all your Software Development and FAT needs...

What’s Included in Your QC Pack?
QC Packs for all your Software Development and FAT needs...
  • 1. PLC - Plant Software Areas
  • 2. SCADA - Plant Software Areas
  • 3. Server(s) - Configuration
  • 4. Engineering Workstation(s) - Configuration
  • 5. Operator Workstation(s) - Configuration
  • 6. Historian - Configuration
  • 7. Remote Access Server(s) - Configuration
  • 8. Firewall(s) - Configuration
  • 9. Switch(es) - Configuration

Comparison

Traditional QC Pack creation process

No Activities Personnel Units Estimated Durations Estimated Qty Produced
Admin Eng / Supervisor
1 Prepare Generic QC Packs 1 0 8Hr/days 1
Software Development and FAT
2 Familiarization of Project Panel Manufacturing Requirements 0 1 8Hr/days 4
3 Compiling Lists of Equipment requiring QC Packs 1 1 8Hr/days 1
4 Compile Project Specific QC Packs 1 0 8Hr/days 1 22
5 Review Project Specific QC Packs 0 1 8Hr/days 1 22
Comparisons
14 Up to 100 QC Packs 3 3 8Hr/days 13 100
15 Up to 200 QC Packs 3 3 8Hr/days 17 200
16 Up to 300 QC Packs 3 3 8Hr/days 22 300
17 Up to 400 QC Packs 3 3 8Hr/days 26 400
18 Up to 500 QC Packs 3 3 8Hr/days 30 500

FAQ's (Software Development and FAT)

How do I calculate the number of QC Packs I need?

Use our Software Development and FAT QC Pack Calculator.
Just count the number of equipment items in your design and enter them into the calculator.
It totals everything for you and shows the number of QC Packs needed instantly.

Which package should I choose?

Use the Software Development and FAT QC Pack Calculator.

Your totals will guide you to the right package size, based on actual design volume.

Why are there different package sizes?

It’s about scale.

The more packs you order, the lower your cost per pack—saving you time and budget.

Do all the Software Development and FAT QC Packs contain all the documents?

Every pack includes a complete document set, tailored by type:

1. Software Development and FAT

1.1. Each type of Software Development and FAT QC Pack is dedicated to either;

1.1.1. PLC - Plant Software Areas

1.1.2. SCADA - Plant Software Areas

1.1.3. Server(s) - Configuration

1.1.4. Engineering Workstation(s) - Configuration

1.1.5. Operator Workstation(s) - Configuration

1.1.6. Historian - Configuration

1.1.7. Remote Access Server(s) - Configuration

1.1.8. Firewall(s) - Configuration

1.1.9. Switch(es) - Configuration

Look for the "■" icon in our Deliverables section—that's what’s inside each pack.

How long does Software Development and FAT QC Packs take to deliver?

Delivery time depends on your package size.
Most projects are completed within 6 working days after the preparation work has been done.

Why choose us instead of doing this in-house?

Traditional QC Pack creation slows you down. We flip the script.

We save you time.

We improve the consistency and reliability.

We’ve engineered the system so your team doesn’t have to.

See the comparison section for more detail.

What’s the order process?

1. Book a FREE Consultation—we’ll guide you from Step 2 to 7.

2. Log in / Create your account

3. Set up your Project Profile

4. Complete your Software Development and FAT Calculator

5. Review auto-generated proposal

6. Accept + Pay securely online

7. We start building your QC Packs

Bring Your Project And We Will Create Your QC Packs

Copyright 2026. QCPacks.com. All Rights Reserved.