Process Control (PCS) Panels | |
Remote IO (RIO) Panels | |
Power (IPDB) Panels | |
Network (NDB) Panels | |
Instrument (INB) Panels | |
Marshalling Junction Boxes (MJB) Panels | |
Marshalling Communication Boxes (MCB) Panels | |
Field Communication Boxes (FCB) Panels | |
Radio Communication Boxes (RCB) Panels |
Process Control (PCS) Panels | |
Remote IO (RIO) Panels | |
Power (IPDB) Panels | |
Network (NDB) Panels | |
Instrument (INB) Panels | |
Radio Communication Boxes (RCB) Panels |
Up to 200 packs
QC Packs delivery period
2 Days
No contracts - cancel anytime
Up to 300 packs
QC Packs delivery period
3 Days
No contracts - cancel anytime
Up to 400 packs
QC Packs delivery period
4 Days
No contracts - cancel anytime
Up to 500 packs
QC Packs delivery period
5 Days
No contracts - cancel anytime
Panel Manufacturing | FAT | ||
---|---|---|---|
1 | Process Control (PCS) Panels | 1 | Process Control (PCS) Panels |
2 | Remote IO (RIO) Panels | 2 | Remote IO (RIO) Panels |
3 | Power (IPDB) Panels | 3 | Power (IPDB) Panels |
4 | Network (NDB) Panels | 4 | Network (NDB) Panels |
5 | Instrument (INB) Panels | 5 | Instrument (INB) Panels |
6 | Marshalling Junction Boxes (MJB) Panels | 6 | Radio Communication Boxes (RCB) Panels |
7 | Marshalling Communication Boxes (MCB) Panels (i.e. Asi...) | ||
8 | Field Communication Boxes (FCB) Panels (i.e. Asi...) | ||
9 | Radio Communication Boxes (RCB) Panels |
No | Activities | Personnel | Units | Estimated Durations | Estimated Qty Produced | |
---|---|---|---|---|---|---|
Admin | Eng / Supervisor | |||||
1 | Prepare Generic QC Packs | 1 | 0 | 8Hr/days | ||
Panel Manufacturing | ||||||
2 | Familiarization of Project Panel Manufacturing Requirements | 0 | 1 | 8Hr/days | ||
3 | Compiling Lists of Equipment requiring QC Packs | 1 | 1 | 8Hr/days | ||
4 | Compile Project Specific QC Packs | 1 | 0 | 8Hr/days | ||
5 | Review Project Specific QC Packs | 0 | 1 | 8Hr/days | ||
FAT | ||||||
6 | Familiarization of Project FAT Requirements | 0 | 1 | 8Hr/days | ||
7 | Compiling Lists of Equipment requiring QC Packs | 1 | 1 | 8Hr/days | ||
8 | Compile Project Specific QC Packs | 1 | 0 | 8Hr/days | ||
9 | Review Project Specific QC Packs | 0 | 1 | 8Hr/days | ||
Comparisons | ||||||
14 | Up to 200 QC Packs | 3 | 3 | 8Hr/days | 17 | 200 |
15 | Up to 300 QC Packs | 3 | 3 | 8Hr/days | 22 | 300 |
16 | Up to 400 QC Packs | 3 | 3 | 8Hr/days | 26 | 400 |
17 | Up to 500 QC Packs | 3 | 3 | 8Hr/days | 31 | 500 |
Count the number of individual pieces of equipment based on your design. Enter the numbers into their respective fields in the Panel Manufacturing and FAT QC Pack Calculator. The total number will be totalized. This would represent the total number of QC Packs to be generated, based on your design.
The Panel Manufacturing and FAT QC Pack Calculator would specify the package size that is best suited based on your design.
This allows for economy of scale. The greater the number of Panel Manufacturing and FAT QC Packs to be produced, the lower the per-unit cost.
Each type of Panel Manufacturing and FAT QC Pack is dedicated to the following categories:
1. Panel Manufacturing
1.1. Each type of Panel Manufacturing QC Pack is dedicated to either;
1.1.1. Process Control (PCS) Panels
1.1.2. Remote IO (RIO) Panels
1.1.3. Power (IPDB) Panels
1.1.4. Network (NDB) Panels
1.1.5. Instrument (INB) Panels
1.1.6. Marshalling Junction Boxes (MJB) Panels
1.1.7. Marshalling Communication Boxes (MCB) Panels (i.e., Asi...)
1.1.8. Field Communication Boxes (FCB) Panels (i.e., Asi...)
1.1.9. Radio Communication Boxes (RCB) Panels.
2. FAT
2.1. Each type of FAT QC Pack is dedicated to either;
2.1.1. Process Control (PCS) Panels
2.1.2. Remote IO (RIO) Panels
2.1.3. Power (IPDB) Panels
2.1.4. Network (NDB) Panels
2.1.5. Instrument (INB) Panels
2.1.6. Radio Communication Boxes (RCB) Panels
When you see "■" in the package deliverables list, you know what makes up the full QC Pack. See the different service offerings.
The duration depends on the package size your project requires. The durations vary between 4 and 10 working days after the preparation work has been done.
We would save you time and improve the consistency and reliability of your QC Packs.
Traditionally you would create your QC Packs in parallel with construction. This normally leads to working late nights, causing late sign-offs and handovers.
See the comparison section for more detail.
1. Book your FREE Consultation Session during which we would follow steps 3 to 8.
- OR -
2. You can follow steps 3 to 8 yourself.
3. Create a client account by clicking the "Login" link.
4. You will then be taken to a client area.
5. In the client area, you need to create a Project Profile.
6. You will then need to complete a Panel Manufacturing and FAT QC Pack calculation form to determine the package size.
7. That will generate a proposal.
8. On acceptance, the order form will open for payment.
Copyright 2025. QCPacks.com. All Rights Reserved.