Packages for your Manufacturing and

FAT QP Packs!

We've Got A Package For You!

Our Premium Value Pack Accelerator System has packaged options to suite all your Manufacturing and FAT needs.

QC Pack Calculators

Calculators to determine your project's

QC Pack requirements.

Manufacturing and FAT
QC Pack Totals
0
Package Proposal
0
Panel Manufacturing Totals
0
Panel FAT Totals
0

Panel Manufacturing

Process Control (PCS) Panels
Remote IO (RIO) Panels
Power (IPDB) Panels
Network (NDB) Panels
Instrument (INB) Panels
Marshalling Junction Boxes (MJB) Panels
Marshalling Communication Boxes (MCB) Panels
Field Communication Boxes (FCB) Panels
Radio Communication Boxes (RCB) Panels

Panel FAT

Process Control (PCS) Panels
Remote IO (RIO) Panels
Power (IPDB) Panels
Network (NDB) Panels
Instrument (INB) Panels
Radio Communication Boxes (RCB) Panels

Manufacturing and FAT Packages

Packages to suite all project sizes.

Extra Small

Up to 200 packs

QC Packs delivery period

  • 2 Days

No contracts - cancel anytime

small

Up to 300 packs

QC Packs delivery period

  • 3 Days

No contracts - cancel anytime

Medium

Up to 400 packs

QC Packs delivery period

  • 4 Days

No contracts - cancel anytime

large

Up to 500 packs

QC Packs delivery period

  • 5 Days

No contracts - cancel anytime

Package Inclusions

QC Packs for all your Manufacturing and FAT needs...

Panel Manufacturing FAT
1Process Control (PCS) Panels1Process Control (PCS) Panels
2Remote IO (RIO) Panels2Remote IO (RIO) Panels
3Power (IPDB) Panels3Power (IPDB) Panels
4Network (NDB) Panels4Network (NDB) Panels
5Instrument (INB) Panels5Instrument (INB) Panels
6Marshalling Junction Boxes (MJB) Panels6Radio Communication Boxes (RCB) Panels
7Marshalling Communication Boxes (MCB) Panels (i.e. Asi...)
8Field Communication Boxes (FCB) Panels (i.e. Asi...)
9Radio Communication Boxes (RCB) Panels

Comparison

Traditional QC Pack Creation Process

No Activities Personnel Units Estimated Durations Estimated Qty Produced
Admin Eng / Supervisor
1 Prepare Generic QC Packs 1 0 8Hr/days
Panel Manufacturing
2Familiarization of Project Panel Manufacturing Requirements018Hr/days
3Compiling Lists of Equipment requiring QC Packs118Hr/days
4Compile Project Specific QC Packs108Hr/days
5Review Project Specific QC Packs018Hr/days
FAT
6Familiarization of Project FAT Requirements018Hr/days
7Compiling Lists of Equipment requiring QC Packs118Hr/days
8Compile Project Specific QC Packs108Hr/days
9Review Project Specific QC Packs018Hr/days
Comparisons
14Up to 200 QC Packs338Hr/days17200
15Up to 300 QC Packs338Hr/days22300
16Up to 400 QC Packs338Hr/days26400
17Up to 500 QC Packs338Hr/days31500

FAQ's (Panel Manufacturing and FAT)

Question 1: How do I determine the number of QC Packs required for my project's panel manufacturing and FAT requirements?

Count the number of individual pieces of equipment based on your design. Enter the numbers into their respective fields in the Panel Manufacturing and FAT QC Pack Calculator. The total number will be totalized. This would represent the total number of QC Packs to be generated, based on your design.

Question 2: How do I know which package to choose for my project's Panel Manufacturing and FAT requirements?

The Panel Manufacturing and FAT QC Pack Calculator would specify the package size that is best suited based on your design.

Question 3: Why are there so many package sizes?

This allows for economy of scale. The greater the number of Panel Manufacturing and FAT QC Packs to be produced, the lower the per-unit cost.

Question 4: Do all the Panel Manufacturing and FAT QC Packs contain all the documents?

Each type of Panel Manufacturing and FAT QC Pack is dedicated to the following categories:

1. Panel Manufacturing

1.1. Each type of Panel Manufacturing QC Pack is dedicated to either;

1.1.1. Process Control (PCS) Panels

1.1.2. Remote IO (RIO) Panels

1.1.3. Power (IPDB) Panels

1.1.4. Network (NDB) Panels

1.1.5. Instrument (INB) Panels

1.1.6. Marshalling Junction Boxes (MJB) Panels

1.1.7. Marshalling Communication Boxes (MCB) Panels (i.e., Asi...)

1.1.8. Field Communication Boxes (FCB) Panels (i.e., Asi...)

1.1.9. Radio Communication Boxes (RCB) Panels.

2. FAT

2.1. Each type of FAT QC Pack is dedicated to either;

2.1.1. Process Control (PCS) Panels

2.1.2. Remote IO (RIO) Panels

2.1.3. Power (IPDB) Panels

2.1.4. Network (NDB) Panels

2.1.5. Instrument (INB) Panels

2.1.6. Radio Communication Boxes (RCB) Panels

When you see "■" in the package deliverables list, you know what makes up the full QC Pack. See the different service offerings.

Question 5: How long does it take to create the Panel Manufacturing and FAT QC Packs?

The duration depends on the package size your project requires. The durations vary between 4 and 10 working days after the preparation work has been done.

Question 6: Why should I use you?

We would save you time and improve the consistency and reliability of your QC Packs.

Traditionally you would create your QC Packs in parallel with construction. This normally leads to working late nights, causing late sign-offs and handovers.

See the comparison section for more detail.

Question 7: What is the process to order Panel Manufacturing and FAT QC Packs?

1. Book your FREE Consultation Session during which we would follow steps 3 to 8.

- OR -

2. You can follow steps 3 to 8 yourself.

3. Create a client account by clicking the "Login" link.

4. You will then be taken to a client area.

5. In the client area, you need to create a Project Profile.

6. You will then need to complete a Panel Manufacturing and FAT QC Pack calculation form to determine the package size.

7. That will generate a proposal.

8. On acceptance, the order form will open for payment.

Let us build your next project's QC Packs—faster, smarter, and stress-free.

Copyright 2025. QCPacks.com. All Rights Reserved.